NDDC To Complete Failed East West Road in 3 Weeks

Hamilton Nwosa
Writer

Ad

Alleged Christian Genocide: Nigerian Lawmakers Slam US Bill, Call It A “Malicious lie”

By Abiola Olawale The House of Representatives on Wednesday condemned a United States congressional bill accusing Nigerian officials of allegedly enabling "systematic" religious killings, particularly against Christians. Lawmakers branded the legislation a "gross misrepresentation" of the country's security woes, insisting that violence stems from terrorism and banditry, not state-sponsored persecution. This position comes in response…

Alleged ₦4bn Fraud: Drama as Kano Anti-Graft Agency Moves to Probe Ganduje’s Govt

By Abiola Olawale The Kano State Public Complaints and Anti-Corruption Commission (PCACC) has launched an investigation into an alleged diversion of over ₦4 billion in public funds during the tenure of former Governor Abdullahi Umar Ganduje. The New Diplomat reports that the probe is said to be centered on the Dala Inland Dry Port project.…

APC secures two-thirds senate majority as Enugu Labour Party senator defects

By Obinna Uballa The ruling All Progressives Congress (APC) has tightened its grip on the Senate after Senator Kelvin Chukwu, representing Enugu East, defected from the Labour Party (LP) to the APC. Senate President Godswill Akpabio formally announced Chukwu’s defection during Wednesday’s plenary, raising the APC’s strength in the upper chamber to 73 seats, a…

Ad

The Managing Director of the Niger Delta Development Commission, NDDC, Mr. Nsima Ekere, has assured that the emergency repairs on failed portions of the East West Road, between Eleme Junction and Onne Junction in Rivers State will be completed within three weeks.

Mr. Ekere gave the assurance while inspecting work on the road yesterday. He was accompanied by the Executive Director Projects, Engr. Samuel Adjogbe, and other directors of the Commission.

The NDDC Chief Executive stressed the importance of the road, describing it as the gateway to economic activities in the Niger Delta region. He declared: “This road means a whole lot to the people of the Niger Delta.”

Mr Ekere assured that NDDC would ensure that the project was properly supervised to guarantee quality, adding: “So far, the quality of work here is impressive. I am not an engineer, but even as a lay man, the fact that you have to excavate as much as 2.5 metres in some areas to remove unsuitable materials before sand filling, speaks a lot about the work.”

He commended the contractor for mobilization to the site promptly and challenged other Nigerian contractors to work more for quality rather than profit. “It is not as if the type of engineering we study in Nigeria is different from what is obtainable in any other part of the world. It is just a question of our attitude to work,” he declared.

Mr Ekere stated further: “For us in NDDC, we are interested in quality. We want to shame our critics and we want to ensure that we deliver for the common good of the people of the Niger Delta. We are committed to delivering quality roads and other infrastructure that meet international best practices and standards.”

The NDDC boss said that the objective of the Commission was to ameliorate the sufferings of motorists who ply the road, as well as improve the living conditions of the people of the region and urged the contractor to speed up work on the repairs.

Briefing the NDDC boss on the emergency repairs, the Project Manager, Engr. Efe Eloho, said that they faced a challenge with the soil texture, but promised that the repairs would stand the test of time. He noted: “We excavate as much as 2.5 metres in some areas to remove unsuitable materials before filling with sharp sand and hard core.”

Engr. Eloho said that although the road was a major route for fuel tankers, he could guarantee that it would last for up to 20 years because of the high quality of work put into it.

Some excited motorists, who met the team at the inspection site at the Eleme Junction axis, praised the NDDC for the urgent intervention.

Mr. Paul Okoede, who spoke for the road users, said that the highway was critical to the economic activities of the south-south region, praying that God should bless President Muhammadu Buhari to encourage him to do more.

Ad

Unlocking Opportunities in the Gulf of Guinea during UNGA80
X whatsapp