Lagos Flags Off Work On Oshodi-Airport Road

Hamilton Nwosa
Writer
The New Oshodi Airport Road scheduled for completion in 15 months

Ad

Optimism as Nigeria’s Inflation Rate falls to 21.88% in July 2025

By Abiola Olawale Nigeria’s headline inflation rate has eased to 21.88% in July 2025, marking a continued downward trend from 22.22% in June, according to the latest Consumer Price Index (CPI) report released by the National Bureau of Statistics (NBS). The NBS reported that the decline, representing a 0.34% drop month-on-month, signals optimism for economic…

Trump-Putin:Ukraine Targets Russian Oil, Arms Ahead of Summit

Hours before the Trump-Putin meeting in Alaska, Ukraine said it had struck an oil refinery in Russia and a Caspian port that Moscow uses to ship weapons from Iran for the war in Ukraine. Ukraine said it attacked overnight the Syzran refinery, owned by oil giant Rosneft and located in Russia’s Samara region, about 500…

Crude Oil Falls as EIA Forecasts Larger Global Oil Surplus

Crude oil prices on Tuesday fell on the possibility of progress at the Trump-Putin summit in Alaska on Friday regarding the Russia-Ukraine war, which could result in reduced sanctions on Russian oil. The oil markets also remain concerned about an oil surplus after the EIA on Tuesday raised its forecast for the 2025 global oil…

Ad

The Lagos State Government on Monday flagged off the building  of a 10-lane Oshodi-International Airport Road, with a pledge to complete the project within the next 15 months.

The state Commissioner for Waterfront Infrastructure Development, Mr Adebowale Akinsanya, said at the ceremony that the project was in line with the state government’s commitment to transform the entire axis.

Akinsanya said that the state government took it upon itself to undertake the reconstruction of the road, being one of the busiest roads in the state with vehicular volume  average of 50,000  daily.

According to him, the poor state of the road is not acceptable for the status of the state as the fifth largest economy in Africa and the nation’s commercial hub.

Akinsanya said some of the fences along the corridor had been identified to be within the right of way, adding that government would minimise the impact of the project on property owners.

“To fast-track the project, three groups of workers will work on the project and they will work day and night, while upon completion, the project will be linked to the Oworonshoki Reclamation Project, which is also ongoing,” he said.

The Airport road today

The commissioner said that a stakeholders’ meeting would hold on Thursday to sensitise people of the area about the project.

He urged the residents and motorists to cooperate with the state government while the construction would last, saying that the intention was to transform the area.

“There will be some minor inconveniences, but we are going to mitigate the impact. The work will be accelerated.

“The project is to make life easier for everybody. We just want to appeal to people to cooperate with us.

“We will be here to talk to the people in case of any issue, and we are also working with our partner, the Federal Airports Authority of Nigeria (FAAN),” Akinsanya said.

Also, Mr Biodun Otunola, the Managing Director of Planet Projects, the firm that designed the project, said that prior to the commencement of the construction, adequate feasibility studies were carried out.

Otunola said that the project, upon completion, would facilitate total transformation of Oshodi and International Airport corridor.

The managing director said that in as much as there would not be alternative roads created specifically for the project, adequate measures had been put in place to educate the public on the stages that would be developed.

He said that the project would be executed in phases, while motorists would make use of other sections of the road during construction work on a particular section.

The News Agency of Nigeria (NAN) reports that the project designs include reconstruction and expansion of the existing carriage to a three-lane expressway on both directions, construction of a two-lane service roads in both directions.

They are construction of a Ramp Bridge to provide a U-turn from Ajao Estate to Airport, construction of a flyover at NAHCO/Toll Gate and drainage works.

Others include the removal of existing Pedestrian Bridge at Ajao Estate and construction of Pedestrian Bridges at Ajao Estate and NAHCO/Hajj Camp, construction of Slip Road to provide access to Ajao Estate, construction of Lay-bys and installation of street lights.

Ad

X whatsapp