FG Assures on Timely Rehabilitation of Ibadan-Ife-Ilesa Road

Hamilton Nwosa
Writer
FG Assures on Timely Rehabilitation of Ibadan-Ife-Ilesa Road

Ad

EU slams Musk’s X with $140m penalty, defies U.S. pressure in landmark tech-regulation showdown

By Obinna Uballa The European Union on Friday imposed a 120-million-euro ($140-million) fine on Elon Musk’s social media platform, X, for violating transparency rules under the bloc’s sweeping Digital Services Act (DSA), a decision that sets up a direct confrontation with the administration of United States President Donald Trump. The penalty, the first issued by…

Musk Sells Another $6.9 Billion In Tesla Shares

[VIDEO] ‘Things have gotten dangerously out of hand,’ 2Face cries out

https://youtube.com/shorts/vV5I8Zcj-vg By Obinna Uballa Nigerian music legend Innocent Idibia, popularly known as 2Face or 2Baba, has spoken out in a dramatic video posted on X.com late Thursday, accusing members of his own family of spreading damaging rumours, endangering his partner Natasha, and worsening the turmoil surrounding his private life. The visibly distressed singer said the…

Supreme Court dismisses Osun’s suit over withheld LG funds

By Obinna Uballa The Supreme Court on Friday struck out a suit filed by the Osun State Government seeking to compel the Federal Government to release withheld allocations for the state’s local government areas. In a 6-1 ruling, a seven-member panel of the apex court held that the case, filed by the state’s Attorney General,…

Ad

Mr Kayode Ibrahim, Oyo State Controller of Works, Federal Ministry of Works and Housing, says the ministry is making frantic efforts at ensuring timely rehabilitation of Ibadan-Ife-Ilesa dual carriage way.

Ibrahim stated this on Saturday in an interview with the News Agency of Nigeria (NAN) in Ibadan.

He recalled that the Federal Executive Council had, in 2019, approved the reconstruction of the dual carriage way by Kopek Construction Company at the cost of N79 billion, adding that the contractor was preparing pre-cast elements to be used for the work.

“We are hopeful that with good funding, the full rehabilitation work would be completed within the stipulated time,” he said.

According to him, while the contractor is waiting to be fully mobilised, a serious washout is threatening to cut off the road at a section around Celica area in Ibadan.

“So the contractor went to that spot to put a new culvert and fill the embarkment, thereby halting the washout. The failed portion has now been put back to shape.

“You can now drive smoothly on that section of the road. But, the truth is that because the project is a full rehabilitation, you cannot be laying asphalt on that spot alone.

“Asphalt laying has to be done on the entire section so that it will not look like a patched work,” he explained.

Ibrahim admonished motorists, particularly owners and operators of articulated vehicles, to always ensure that their vehicles were in good working condition before embarking on any trip.

NAN reports that the admonition was sequel to the accident which occurred at the rehabilitated spot around Celica area of Ibadan on Monday, involving an articulated truck and a taxi cab, and which claimed five lives.

The controller refuted the claim that deplorable condition of the section of the road was responsible for the accident.

He said that the failed portion had since been fixed and that the point where the accident occurred was smooth and motorable.

Ibrahim explained that reports from the Federal Road Safety Corps (FRSC) showed that the accident was as a result of dangerous driving.

“We heard that the driver of the truck lost control due to break failure and rammed into a cab, with both ending up in a ditch,” he added.

The controller, however, sympathised with the families of those who lost their lives in the accident. (NAN) (www.nannews.ng)

Ad

X whatsapp